Installation Guide
Cargo Net
KIT INCLUDES:
QTY DESCRIPTION
1 Cargo Net
9 Staples
2 Carriage Bolts
6 Loc Nuts
4 Bolt Covers
2 Wood Loc Washers
44 2” Screws
6 Flat Washers
MATERIALS REQUIRED (sold separately)
QTY DESCRIPTION
1 4” x 4” x 8’
INSTRUCTIONS
1. Cut 4” x 4” x 8’ to 72”. Align 4” x 4” base with right leg of deck
assembly. Mark the center of the leg and base junctions and drill
a 5/16” hole through both boards. Insert a carriage bolt through a
wood loc washer and through each hole (on front side). Secure
using a washer and loc nut (back side).
2. Drill four 5/16” holes in the top of the beam as indicated in Fig. 1.
Drill four 3/8” holes in the base as indicated in Fig. 1.
3. Remove existing carriage bolt from the bracket and replace with
the rst Cargo Net eye bolt. Insert remaining eye bolts through
the beam and secure all of them using a washer and loc nut (see
Fig. 2).
4. Place two rope staples as indicated in Fig. 3.
Thread the Cargo Net through the holes of the base and loop
through the staples as shown (Fig. 3). Pull tight and secure by
pounding staples tight against the base.
5. Place bolt covers over the bolts as indicated in Fig. 2. Secure bolt
covers using 2” screws.
1"
1"
Fig. 3
Fig. 2
Washer and Loc Nut
Bolt Cover
NE 4481
PIONEER™ APPLICATION
Fig. 1
6-1/2”
10”
10” 10”
6-1/2”
10”
10” 10”
1”
1”
LA 7347