Instructions / Assembly
31
PB 9210 Assembly Instructions
(3)
2’’ Lag Screws
per bracket
)LJD
Monkey Bar Assembly Cont.
Attach the Monkey Bar Frame to the Monkey Bar Ladder as shown in )LJ.
2. With the help of others, position the finished assembly to the unit )LJD. Determine post locations. Remove assembly and dig two 16”
deep holes at the previously determined spots as shown in )LJE. Reposition assembly to unit placing posts in the holes.
Level the assembly and attach to the unit using six 1-1/4” Lag screws per bracket. Fill in holes and compact earth around posts.
)LJE
9-1/2”
20-1/2”
76-1/2”
16”
14”
31-1/2”
(3)
1-1/4’’ Lag screws
per bracket
)LJ
2’’ Lag screw
FLUSH
FLUSH
HINT: Use slots to
fit in between
4x4’s.