Instructions / Assembly
13
PB 9210 Assembly Instructions
Fig. 2
Fig. 2a
Frame Assemblies Cont.
Attach 2’’ x 4’’’ boards as shown in (Fig. 2) and (Fig. 2a).
2. Attach 2’’ x 4’’ and 4’’ x 4’’ boards as shown in (Fig. 2) through (Fig. 2a).
)UDPH
Use a 2’’ lag screw
to hold bracket in
place for later use.
Look for ‘’TOP’’
stamp on brackets
while installing.
TOP
GAP on
this side
•WARNING•
Avoid splitting your lumber
by offsetting your screws at
OHDVW··IURPHGJH
2-1/2’’ screw
2’’ x 4’’ x 32’’
2’’ Lag screw
2’’ x 4’’ x 32’’
Frame 2
4’’ x 4’’ x 32’’
1-1/4’’ Lag screw
(3)
2-1/2’’ screws
per joint
(3)
2-1/2’’ screws
per joint
(2) 1-1/4’’ lag screws
and
(2) 2’’ lag screws
per bracket
(4) 2’’ lag screws
per bracket
(4) 2’’ lag screws
per bracket