PB 9210 Set Dim. 14’-6”W x 15’-8”L x 10’H Est. Building Time: 6-8 hr. SLIDE AND 4’’ x 4’’ LUMBER SOLD SEPARATELY check out http://www.swing-n-slide.com/planupdates.htm for updates to these instructions. ASSEMBLY INSTRUCTIONS Swing•N•Slide • 1212 Barberry Drive • Janesville, Wisconsin 53545 Visit our web site at: www.swing-n-slide.
PB 9210 Assembly Instructions Safety Checklist for Swing-N-Slide Play Sets and Accessories Observing the following statesments and warnings reduces the likelihood of serious or fatal injury. This playset has a weight capacity of 1200 pounds based on a maximum occupancy of eight (8). Total weight capacity does not include accessories added after purchase. This playset is intended for use by children from (2) to (10) years of age. On-site adult supervision for children of all ages is recommended.
PB 9210 Assembly Instructions PLAYSET MAINTENANCE Cosmetic defects that do not affect the structural integrity of the product, or natural defects of wood such as warping, splitting, checking, twisting, shrinkage, swelling or any other physical properties of wood that do not present a safety hazard, are not covered by our warranty. To help minimize these natural defects we recommend applying a sealer or stain every two or three years, or more often as the climate dictates.
PB 9210 Assembly Instructions PLAYGROUND SURFACING MATERIALS SECTION 4 OF THE CONSUMER PRODUCT SAFETY COMMISSION’S OUTDOOR HOME PLAYGROUND SAFETY HANDBOOK9 Select Protective Surfacing One of the most important things you can do to reduce the likelihood of serious head injuries is to install shock-absorbing protective surfacing under and around your play equipment. The protective surfacing should be applied to a depth that is suitable for the equipment height in accordance with ASTM Specification F 1292.
PB 9210 Assembly Instructions TOOLS REQUIRED HAMMER ELECTRIC DRILL TAPE MEASURE 3/4’’ Pan Head Screw 1-1/4’’ Lag Screw 2” lag screw SAFETY GLASSES & DUST MASK CARPENTER’S SQUARE (2) 1/2’’ panhead screws (2) 1-3/4’’ panhead screws Tarp Washers (4) 5/16’’Hex Head Lag Screws 30mm screws 5/16’’ flat washers 1-1/4’’ screws 1-1/2’’ screws (2) 1/4’’ flat washers T-Nut 2-1/2’’ screws (2) Loc-Nuts (2) Fence Staple (2) 5/16’’ x 3-1/2’’ Hex Head Bolt 5
PB 9210 Assembly Instructions (2) Shelf-Loc (2) Split Beam bracket Eye Strap Wrap-Loc (4) 2’’ x 4’’ Shelf-Loc Slotted Beam Clamp (2) EZ Frame Brackets (2) ‘L’ Brackets Step Brackets (2) Boomerang Brackets T20 Torx® Bit PB 9210 Plan T30 Torx® Bit Plan 6 3/8” DRILL BIT (5’’ Min.
PB 9210 Assembly Instructions (4) Climbing Rocks with Hardware (2) Safety Handles Swing Hangers (4) Metal Rungs Climbing Rope 150 lb Weight Limit R (4) 58" Coated Chain Name Plate with Hardware (2) 32" Coated Chain (2) Trapeze Rings Quick Links Trapeze Bar (2) Swing Seat WS 4518 weight limit: 115 lbs.
PB 9210 Assembly Instructions 3% %RDUG /LVW SOLD SEPARATELY (1) 4'' x 4'' x 120'' (8) 4'' x 4'' x 96'' (1) 4'' x 4'' x 32'' (2) 2'' x 4'' x 35'' (3) 2'' x 4'' x 38'' (13) 2'' x 4'' x 47-1/2'' (2) 2'' x 4'' x 38-1/2'' (3) 2'' x 4'' x 32'' (4) 2'' x 4'' x 11-3/4'' (3) 2'' x 4'' x 23'' (3) 5/8'' x 6'' x 44'' (2) 5/8'' x 3-1/4'' x 23-3/4'' (7) 5/4'' x 6'' x 32'' (2) 5/4'' x 4'' x 24-3/4'' (4) 5/8'' x 6'' x 28-3/4'' (6) 1'' x 6'' x 24-3/4'' (2) 5/4'' x 4'' x 32'' N O M IN AL M AT E R IAL S IZ
PB 9210 Assembly Instructions Playset Safety Area Min. Use Zone: 28’-4” x 27’-8” Set Dim.
PB 9210 Assembly Instructions How to select the correct fastener Use these 2 pictorial guides to help select the correct fastener(s) for the lumber attachment you are making. Each diagram will highlight the correct number of fasteners to use and where to attach them. 5/4’’ x 4’’ to 4’’ x 4’’ (3) 2-1/2’’ screws Apply 2-1/2” screws to the 5/4’’ x 4’’ and 2”x4” boards when attaching to 4”x4” uprights.
PB 9210 Assembly Instructions Understanding how the Bracket System Works Example of a Shelf-Loc bracket connection. Shelf-Loc Bracket 3 2 1 4 CORRECT! Wrap-Loc WRONG! Brackets ‘’clipped’’ brackets NOT interlocked! Example of a Shelf-Loc bracket connection. Look for ‘’TOP’’ stamp on bracket for correct orientation. Top of bracket Introduction to the Bracket system Wrap-Loc TOP ALWAYS Use 2’’ lag screws on all brackets. 2. Brackets ‘’clip’’ to each other.
PB 9210 Assembly Instructions Look for ‘’TOP’’ stamp on brackets while installing.
PB 9210 Assembly Instructions •WARNING• Avoid splitting your lumber by offsetting your screws at OHDVW ·· IURP HGJH Look for ‘’TOP’’ stamp on brackets while installing. TO P Use a 2’’ lag screw to hold bracket in place for later use. GAP on this side Fig. 2a Fig.
PB 9210 Assembly Instructions )LJ E DO NOT USE LAG SCREW HERE )LJ 2’’ 2’’ x4 ’’ x 47- 1/2 2’’ 2’’ x4 ’’ x (2) 1-1/4’’ Lag x4 ’’ x 47- 1/2 ’’ (2) 2’’ Lag NOTE: Upper screws are (2) 1-1/4’’ Lag Screws, Lower screws are (2) 2’’ Lag Screws.
PB 9210 Assembly Instructions )LJ F 5/8 ’’ x (2) 2-1/2’’ screws per joint 3-1 /4’’ x )LJ G ’’ 5/8 241/2 ’’ ’’ 1/2 24x ’’ -1/4 x3 (2) 2-1/2’’ screws per joint Frame 2 )UDPH HINT: Pre drill 1/8” hole to help avoid splitting. 2-1/2’’ screw Double check to make VXUH [ ERDUGV DUH VTXDUH Frame Assemblies Cont. Attach 5/8’’ x 3-1/4’’ x 24-1/2’’ board to Frame 1 as shown in )LJ F . 2. Attach 5/8’’ x 3-1/4’’ x 24-1/2’’ board to Frame 2 as shown in )LJ G .
PB 9210 Assembly Instructions Fig. 4 ’’ x 5/4 (2) x 4’’ ’’ 3/4 24- Fig. 4a ’’ 5/4 (7) ’’ x x6 (2) 2-1/2’’ screws per joint NOTE: Space evenly (4) 1-1/2’’ screws 2’’ x 4’’ x 18’ ’ 111/4 ’’ UNDERDECK VIEW Deck Assembly 1-1/2’’ screw Attach deck boards as shown in (Fig. 4). 2. Attach slide support board as shown in (Fig. 4a).
PB 9210 Assembly Instructions FLUSH )LJ FLUSH FLUSH x 2’’ 4’’ /2’’ 7-1 4 x FLUSH x 2’’ 4’’ /2’’ 7-1 x4 (3) 2-1/2’’ screws per joint )LJ D (3) 2-1/2’’ screws per joint 5/4 ’’ x Roof and Barrier Supports 2-1/2’’ screw Attach roof support boards as shown in )LJ . 2. Attach barrier support boards as shown in )LJ D .
PB 9210 Assembly Instructions )LJ Swing Beam Drill Locations Use a 3/8’’ drill bit to drill a 3/8’’ hole through the beam at each location shown in )LJ 2. Install Swing Hangers onto swing beam at locations shown. 118'' 19'' Note: Swing Hangers must be installed on the same side dimensions were originally measured and marked.
PB 9210 Assembly Instructions )LJ Hammer 3/8'' hole t-nut T-nut Bottom Beam Clamp (4) 1-1/4'' screws Use Screwdriver to aid in tightening Swing Hanger Swing Beam Drill Locations 6WHS Tap t-nut into 3/8’’ hole as shown in )LJ . 2. Step 2: Place a bottom beam clamp over the swing hanger as shown in )LJ . 6WHS Insert the swing hanger into the beam and thread it into the T-nut until it is flush or near flush with the top of the T-nut.
PB 9210 Assembly Instructions )LJ A-Frame Assembly (8) 2-1/2’’ Screws layout 4’’ x 4’’s as shown in )LJ 2. Allign EZ Frame Bracket with face of 4’’ x 4’’s. Secure EZ Frame Bracket with (8) 2-1/2’’ screws to 4’’ x 4’’s making sure they are flush with each other. 4. Secure 2’’ x 4’’ to 4’’ x 4’’s as shown in (Fig. D Flip over and add 2nd bracket. Repeat steps 2 and 3.
PB 9210 Assembly Instructions Fig. 9 T-nut Washer 2-1/2’’ screws Ca nt ile ve rb ea m Hex Bolt 2-1/2’’ screw A-Frame Assembly cont. Attach A-Frame beam to Swing Beam using (2) hex bolts and 4 screws as shown in (Fig. 9). 2. Tighten hex bolt to flush with top of T-nut. Repeat steps 1 & 2 on second bracket.
PB 9210 Assembly Instructions A-Frame Assembly cont. )LJ Position Split-Brackets on 4’’ x 4’’ x 47-1/2’’ )LJ ). 2. With the help of others, lift A-Frame and Swing Beam Assembly and center onto unit as shown in (Fig. . Secure as shown in )LJ D .
PB 9210 Assembly Instructions )LJ x 2’’ 2’’ x 4’’ x 4’’ /2’’ 7-1 4 x x 2’’ 32’ ’ ’’ 1/2 47x 4’’ 80’’ )LJ D (3) 2-1/2’’ screws per joint ’’ 1/2 23- ’’ 5/4 (2) ’’ x x4 ’ 12’ ’’ 1/2 23- ’’ 5/4 (2) (3) 2-1/2’’ screws per board NOTE: Place flush with top of bracket and level. Barrier support Boards 2-1/2’’ screw Install barrier support boards as shown in )LJ and )LJ D .
PB 9210 Assembly Instructions )LJ (3) 5/8 ’’ x (2) 2-1/2’’ screws per joint 6’’ x 44’ ’ NOTE: 2’’ Gap Between Boards is Typical NOTE: Space evenly (2) 1-1/2’’ screws per joint )LJ D ’’ 1/2 23- ’’ 5/8 (2) ’’ x x6 ’’ 3/4 28- )LJ E (2) 1-1/2’’ screws per joint 1-1/4’’ Gap Typ. Barrier Board Installation Install barrier boards as shown in )LJ amd )LJ D . Note: There will be a 1-1/4’’ gap between the deck and the bottom of the barrier boards as shown in )LJ E .
PB 9210 Assembly Instructions )LJ ’’ 1/2 23- )LJ E (2) 1-1/2’’ screws per joint ’’ 5/8 (2) ’’ x x6 ’’ 3/4 28- ’’ x 5/8 (2) 4’’ ut eC ngl A ’ /4’ 6-1 x1 (2) 1-1/2’’ screws per joint in corner post (2) 30mm screws per joint in board )LJ D 1-1/4’’ Gap Typ. HINT: Pre drill 1/8” hole to help avoid splitting. Barrier Board Installation 30mm screw Install barrier boards as shown in )LJ .
PB 9210 Assembly Instructions )LJ F FLUSH FLUSH (3) 2-1/2’’ screws per board x 2’’ (4) x 4’’ (3) 2-1/2’’ screws per board k loc of B o ’’ R 3/4 11- 2-1/2’’ screw Roof Trim Block Installation Install (4) 2” x 4” x 11-3/4” boards as shown in )LJ F .
PB 9210 Assembly Instructions )LJ x2 5/8’’ x 3-1/4’’ x 23-3/4’’ (2) 2-1/2’’ Screws per joint FLUSH )LJ D x 2’’ x 4’’ (2) 1-1/2’’ Screws per joint ’ /2’ -1 38 x 2’’ ’’ 35 x 4’’ (2) 2-1/2’’ Screws per joint 2’’ x 4’’ x 38’’ HINT: Pre drill 1/8” hole to help avoid splitting.
PB 9210 Assembly Instructions )LJ F LEVEL FLUSH FLUSH )LJ G LE VE L (2) 2-1/2’’ Screws per joint FLUSH FLUSH )LJ H (2) 2-1/2’’ Screws per joint (2) 2-1/2’’ Screws per joint FLUSH (2) 2-1/2’’ Screws per joint Washer 3/4” Screw 3 Per Side Roof Installation Attach A-Frame as shown in )LJ F )LJ G . NOTE: Secure boards in place by installing screws from the outside of the A-Frame.. Install Tarp as shown in )LJ H .
PB 9210 Assembly Instructions 3/4’’ GAP (6) 1’’ x 6’’ x 24-3/4’’ )LJ 2’’ x 4’’ x 47-1/2’’ 2’’ x 4’’ x 47-1/2’’ Note: )LJ E 2-3/4’’ GAP TYP. HINT: Pre drill 1/8” hole to help avoid splitting. FLUSH FLUSH (2) 2-1/2’’ Screws per joint (3) 2-1/2’’ Screws per joint FLUSH on ends and bottom )LJ D (2)”T” nuts 3/8” Holes (2) 1-1/4’’ Hex Head Bolts Hold (rock) (1) Lock Washer per bolt (1) Flat Washer per bolt 2-1/2’’ screw Rock Wall Assembly Assemble Rock Wall as shown in )LJ . 2.
PB 9210 Assembly Instructions )LJ 2’’ x 4’’ x 47-1/2’’ )LJ D FLUSH (3) 1-1/4’’ Lag Screws per bracket 23’’ FLUSH 11-3/4’’ 11-3/4’’ 11-3/4’’ (2) 1-1/4’’ Lag Screws per rung 1-1/4’’ 2’’ x 4’’ x 47-1/2’’ FLUSH Center Lag Screws in slot of rung. )LJ E (3) 2’’ x 4’’ x 23’’ 4’’ x 4’’ x 96’’ 4’’ x 4’’ x 96’’ (6) 1-1/4’’ Screws per bracket FLUSH 48’’ 48-1/2’’ 37-1/2’’ 37’’ 26’’ 26-1/2’’ Monkey Bar Assembly Measure and place Monkey Bars on 2’’ x 4’’ boards as shown in )LJ .
PB 9210 Assembly Instructions )LJ D )LJ FLUSH HINT: Use slots to fit in between 4x4’s. (3) 2’’ Lag Screws per bracket FLUSH )LJ E (3) 1-1/4’’ Lag screws per bracket 76-1/2” 31-1/2” 20-1/2” 9-1/2” 14” 16” 2’’ Lag screw Monkey Bar Assembly Cont. Attach the Monkey Bar Frame to the Monkey Bar Ladder as shown in )LJ . 2. With the help of others, position the finished assembly to the unit )LJ D . Determine post locations.
PB 9210 Assembly Instructions Slide Installation. Position slide to determine proper location for stake. 2. Drive wood stake into ground leaving 2’’ exposed. Secure the slide bottom to the stake using (2) 1-1/4’’ deck screws. )LJ D . 4. Attach slide to unit as shown in )LJ . Attach name plate to unit as shown in )LJ . )LJ Name Plate )LJ D (2) 1-1/4’’ screws per joint ·· 7UXVV 6FUHZ 5/4’’ x 4’’ x 17’’ 1-1/4’’ screw Use truss head screws to secure slide to deck.
PB 9210 Assembly Instructions )LJ 2’’ Lag screw )LJ D )LJ E 2’’ x 4’’ x 5/4’’ x 6’’ x 25’’ BACK OF BOARD 32’’ Eye Strap (2) 2’’ Lag Screws 1’’ 1’’ Climbing Rope Secure top of Climbing Rope on the bottom center of the 2’’ x 4’’ x 32’’ as shown in )LJ E . 2. Using two rope staples secure the bottom of the climbing rope. Tap two staples in place approximately 1’’ apart. Wrap the rope under the 5/4’’ x 6’’. Then thread the rope through both staples.
PB 9210 Assembly Instructions Swing Barrier )LJ Swing Beam Guard Attach Swing Beam Guard board as shown in )LJ . 24’’ (3) 2-1/2’’ screws per joint ’’ 5/4 ’’ x x4 ’ 32’ 2-1/2’’ screw Safety Handle Safety Handle. )LJ Mount (2) Safety Handles in the Rock Wall opening approximately 11’’ above the deck surface )LJ .
PB 9210 Assembly Instructions Swings x2 Per Swing Fig. 22 Swing Seat Assembly. Take one length of chain and place the last link of chain through the Quick Link as shown. (Fig. 22). 58" Coated Chain Quick Link x2 Per Swing Fig. 22a 2. Place the Quick Link through the Grommet of the swing seat as shown. (Fig. 22a). Sling Swing Seat BOTTOM OF SEAT x2 Per Swing Fig.
PB 9210 Assembly Instructions Ring/Trapeze Combo Tools Required )RU FKLOGUHQ \HDUV RI DJH :HLJKW OLPLW OEV x2 2 PLIERS x2 WRENCH )LJ x2 x2 4 NOTE: Crimp swing hanger tightly closed x2 Assembly Instructions 1. Attach Quick Link to chain oriented as shown. 2. Attach Quick Link to gym ring as shown. Attach second set of Quick Links (3) links up. Attach Trapeze Bar as shown. 3. Tighten all Quick Links closed with wrench. Hanging Instructions 1.
PB 9210 Assembly Instructions Anchor-It Fig. 24 Flat Washer metal strap 1-1/2” lag bolt Anchor-It Anchor-It Installation. Instructions for Anchoring Swing•N•Slide Activity Centers Determine the final location of your activity center. 2. Place the Anchor-It stakes adjacent to the base and near the corners of your activity center (at the bottom of the legs on swing sets) and twist the auger-style stakes into the ground until only the loop is exposed.
PB 9210 Assembly Instructions Swing-N-Slide® MANUFACTURERS LIMITED WARRANTY Swing-N-Slide® takes great pride in the quality and durability of our products. Our Manufacturer’s Limited Warranty provides confidence and demonstrates our commitment to providing quality residential playground products.
Got Questions? We’ve got answers! Call our Customer Service Representatives or email us at service@swing-n-slide.com $YDLODEOH 0RQGD\ )ULGD\ DP SP &67 Weekend support available April through July Technical support from experienced Swing-N-Slide customer service representatives who have actually built a swing set themselves. © Swing-N-Slide Inc.