Instructions / Assembly
Table Of Contents
- Beauty Page
- Safety Checklist
- Maintenance and Checklist
- Playground Surfacing Materials
- Safety Zones
- Tools Required & Hardware - She
- COMPONENTS - Sheet1(2)(2)(2)
- STEP 002 - Sheet1(2)(2)
- STEP 003 - Sheet1(2)(2)
- STEP 004 - Sheet1(2)(2)
- STEP 005 - Sheet1(2)(2)
- STEP 006 - Sheet1(2)(2)
- STEP 007 - Sheet1(2)(2)
- STEP 008 - Sheet1(2)(2)
- STEP 009 - Sheet1(2)(2)
- STEP 010 - Sheet1(2)(2)
- STEP 011 - Sheet1(2)(2)
- STEP 012 - Sheet1(2)(2)
- STEP 013 - Sheet1(2)(2)
- STEP 014 - Sheet1(2)(2)
FIG. 12.1
QUICK CLIP X 4
PLASTIC COATED END.
FIG. 12.3
FULLY TIGHTEN
WITH PLIERS.
FACE NUT TOWARDS
UNDERSIDE OF
SWING.
CHAIN48"
SWING
X 22434
GREEN COATING
DOWN.
4. REPEAT FOR SECOND CHAIN, QUICK CLIP AND SWING.
ATTACH CHAIN TO QUICK CLIP FIRST, POSITION AT TOP OF LINK AS SHOWN. (FIG. 12.1)1.
PLACE THE QUICK CLIP THROUGH THE GROMMET OF THE SWING. (FIG 12.2)2.
FULLY TIGHTEN THE THREADED SLEEVE OF THE QUICK CLIP WITH PLIERS. (FIG. 12.3) 3.
STEP 12: SWING ASSEMBLY
FIG. 12.2
19