Instructions / Assembly
Table Of Contents
- Beauty Page
- Safety Checklist
- Maintenance and Checklist
- Playground Surfacing Materials
- Safety Zones
- Tools Required & Hardware - She
- COMPONENTS - Sheet1(2)(2)(2)
- STEP 002 - Sheet1(2)(2)
- STEP 003 - Sheet1(2)(2)
- STEP 004 - Sheet1(2)(2)
- STEP 005 - Sheet1(2)(2)
- STEP 006 - Sheet1(2)(2)
- STEP 007 - Sheet1(2)(2)
- STEP 008 - Sheet1(2)(2)
- STEP 009 - Sheet1(2)(2)
- STEP 010 - Sheet1(2)(2)
- STEP 011 - Sheet1(2)(2)
- STEP 012 - Sheet1(2)(2)
- STEP 013 - Sheet1(2)(2)
- STEP 014 - Sheet1(2)(2)
DO NOT FULLY TIGHTEN CARRIAGE BOLT AT THIS TIME.
STEP 6: SWING BEAM ASSEMBLY
LAY A-FRAME ON THE GROUND WITH ANGLED BRACKETS FACING UP.1.
POSITION SWING BEAM ASSEMBLY RESTING UPON A-FRAME.2.
ALIGN HOLES AND INSERT CARRIAGE BOLT.3.
YOU MAY NEED TO TAP BOLTS WITH
HAMMER TO GET THROUGH HOLES.
3/8" FLAT WASHER X 1
X 13/8' LOCK NUT
3/8 X 3-1/4" CARRIAGE BOLT X 1
13