Instructions / Assembly
Table Of Contents
- Beauty Page
- Safety Checklist
- Maintenance and Checklist
- Playground Surfacing Materials
- Safety Zones
- Tools Required & Hardware - She
- COMPONENTS - Sheet1(2)(2)(2)
- STEP 002 - Sheet1(2)(2)
- STEP 003 - Sheet1(2)(2)
- STEP 004 - Sheet1(2)(2)
- STEP 005 - Sheet1(2)(2)
- STEP 006 - Sheet1(2)(2)
- STEP 007 - Sheet1(2)(2)
- STEP 008 - Sheet1(2)(2)
- STEP 009 - Sheet1(2)(2)
- STEP 010 - Sheet1(2)(2)
- STEP 011 - Sheet1(2)(2)
- STEP 012 - Sheet1(2)(2)
- STEP 013 - Sheet1(2)(2)
- STEP 014 - Sheet1(2)(2)
X 23/8" X 3-1/4" CARRIAGE BOLT
X 23/8" LOCK NUT
3/8" FLAT WASHER X 2
DO NOT FULLY TIGHTEN CARRIAGE BOLTS AT THIS TIME.
STEP 5: SWING BEAM ASSEMBLY
POSITION SWING BEAM ASSEMBLY RESTING UPON ONE A-FRAME ONLY.1.
ALIGN HOLES AND INSERT CARRIAGE BOLTS.2.
YOU MAY NEED TO TAP BOLTS WITH
HAMMER TO GET THROUGH HOLES.
12