Installation Guide

Apron Panel
Installation
If the Swanstone top installa-
tion calls for an apron panel
application, construct a wall
frame mount from 1 x4s as
indicated. Attach one, two, or
three apron panels as desired
with panel adhesive (not
included). To insure adhesion
of apron panel to wall frame
mount, clamp apron panel(s)
to wall frame mount for
approximately 24 hours.
Installation Tips
For added support, it is rec-
ommended that the apron
panel(s) be attached to the
adjacent wall. This may be
accomplished by attaching a
90 degree angle clip (not
supplied) to the lower inside
portion of the apron panel
closest to the wall.
Drill a 1/32 pilot hole (3/8
deep) into the Swanstone
apron panel and mount angle
clip to the apron panel with
truss head sheet metal screw.
The wall attachment may be
secured with either wall
anchors or mollies. Drill as
required.
NOTE
If cutting of the apron panel is
required, use a high speed
carbide tipped saw blade. Cut
only from the facing side of
the panel; then sand smooth.
CONTOUR VANITY TOPS AND BOWLS
Installation
Apron Panels
FORM #240-1-96-5M
SWANSTONE
CONTOUR BOWL
CAUTION
Use of a hole saw is pre-
ferred, however, if a punch is
used, insure that ledge is
supported and punch is
placed directly in middle of
knock-out area.
APRON
ADHESIVE
WALL FRAME
MOUNT
Swanstone
Contour Bowl
Wall
Frame
Mount
Large
Clamp
Swanstone Contour
Bowl
Wall Frame
Mount
Angle Clip