Specifications

Checklist
NOTE
Be extra observant of the machine’s movements when starting for the first time after
installation! A safety distance of at least 10 m around the machine is recommended.
Before going through the checklist, ensure that the machine:
has been started
the safety gate is closed
is in excavation mode (not in transport mode)
Checklist
General testing/adjustment(macine not running Sign Sign
1 Check that cables are correctly routed and properly secured, and that cable protection is mounted
where cables can be subjected to wear.
2 Check that the system is correctly connected according to the electrical diagram.
3 Check that the system is correctly fused.
4 Check that no holes or other modifications are made on the shovel boom or on the cab’s ROPS struc-
ture.
5 Check that the user manual accompanies the machine upon delivery to the end-user.
Safety functions (These must always be checked and approved by a person other than the installation techni-
cian).
Sign sign
1 Check that the upper tool lock interlock functions correctly, according to user manual of the machine
2 Check that the lower tool lock functions correctly, according to the user manual of the machine
Testing/adjustment (machine running) Sign Sign
1 Check that the app starts and starts to scan for tools within range.
2 Check that it is possible to connect a tool.
3 Check that LED 3 lights up with a red light when upper tool lock is activated
4 Check that LED 3 lights up with a green light when the lower tool lock is activated.
Quantum
31