User's Manual
Table Of Contents
- 1.Product Overview
- 2.Disclaimer
- 3.UAV Composition
- 4.Technical Parameters
- 5.Check List before Use
- 6.Operating Instructions
- 7.Data Management
- 8.Account Management
- 9.Offline Operation Procedure
- 10.Maintenance Instructions
- 11.Warranty Services
- 12.Nameplate
- EAVision Official Wechat Account
56
⚫
Main Battery: Replace it when the charge and discharge cycles exceed 560 or
the battery has been used for 12 months.
⚫
Water Pump: Replace it when the total operating area reaches 120 Ha.
⚫
Pressure Spray Nozzle: Replace it when the total operating area reaches 120
Ha.
⚫
Motor: Replace it when the total flight time reaches 200 hours.
10.3 Battery Maintenance and Cautions
Maintenance:
⚫
The battery has the function of self-maintenance. Under static environment,
the voltage difference is ≥ 50mV, and the battery starts to balance with the
100mA current. The balance maintenance is closed when the voltage
difference is < 50mV.
⚫
When the battery is fully charged and stored for more than 10 days, the
battery will automatically discharge to about 65% battery power for storage.
⚫
If the battery is idle for a long time, please charge it every 3 months. Please
use slow charge to make up the battery power.
Cautions:
⚫
Battery Storage Conditions: ambient temperature 20 ~ 27 ℃, ambient
humidity ≤ 75% RH.