User's Guide
Table Of Contents
SureCall | 48346 Milmont Drive, Fremont CA 94538 | 1-888-365-6283 | support@surecall.com
15
Chapter 5: Conguration & Testing
CHAPTER 5: CONFIGURATION & TESTING
5.1 Powering on the BDA
To power on the booster:
1. Make sure that exterior and interior antenna cables are rmly connected to the proper ports on the booster.
2. Plug a surge suppressor into a grounded 110 VAC wall outlet.
3. Plug the AC end of the supplied power adapter into the surge suppressor.
4. Plug the DC end of the power adapter into the Power port on the booster.
5. Verify that the green Power light is illuminated.
6. When the booster is turned on, the band lights will ash red and yellow for approximately 10 seconds.
CAUTION: ONLY USE THE POWER SUPPLY INCLUDED
WITH THE BDA. USE OF ANOTHER POWER SUPPLY
COULD DAMAGE THE BDA AND/OR POWER SUPPLY.
CAUTION: DO NOT PROCEED BEYOND THIS POINT
UNTIL THE BDA IS POWERED ON AND NO RED WARNING
LIGHTS ARE ILLUMINATED.
5.2 DIP Switch Conguration
By default, your booster ships with all DIP switches turned OFF to provide maximum gain in all channels. This should
always be your starting point whenever installing or reinstalling the booster. When the booster is turned on, the
band lights will ash red and yellow for approximately 10 seconds. The following diagrams and notes explain how to
interpret, and use, these switch banks.