Manual

Triangular Omni Wheel Vectoring Robot Platform IG32 DM
SuperDroid Robots, Inc Contact
224 Technology Park Lane (919) 557-9162
Fuquay Varina, NC 27526 SDR@SDRobots.com
www.SuperDroidRobots.com
Revised: May 22, 2018 Page 5 of 6
5. Attach the upper deck with the provided standoffs and screws.
6. Layout where you want to mount the battery, switch, and other electronic components. The picture
below has them mounted on the chassis. If you ordered an upper deck you can also mount them to the
top or bottom of it depending on how you want to configure it. Mark the holes with a marker and drill
them (use 1/8” bit for #4-40 clearance hole). Using a center punch before drilling helps prevent the drill
bit from “walking” while drilling the hole.