Assembly Manual

MLT-JR Tracked Robot Platform
SuperDroid Robots, Inc Contact
224 Technology Park Lane (919) 557-9162
Fuquay Varina, NC 27526 SDR@SDRobots.com
www.SuperDroidRobots.com
Revised: May 22, 2018 Page 4 of 13
Mechanical Assembly
Parts of the MLT-JR robot kit.
1. Start by pressing the nuts into place on the wheel bearing hubs. There will be 8 nuts and two bearing hubs.
Sometimes it helps to use one of the #4 machine screws to hammer the nuts into the counter bored holes.