Manual

MLT-42 Kit Assembly Manual
SuperDroid Robots, Inc Contact
224 Technology Park Lane (919) 557-9162
Fuquay Varina, NC 27526 SDR@SDRobots.com
www.SuperDroidRobots.com
Revised: June 22, 2018 Page 5 of 8
Here we have the idler wheel and tension assembly put together. Look at the picture to see
how the lock collar goes into the shaft assembly. Notice the plastic washer between the lock
collar and the bearing also.
Now mount the motor into the chassis. Notice the setscrew in the shaft of the wheel. Be sure
to get it aligned with the flat spot of the motor shaft. This is very important. Use Loctite to keep
it from backing out during operation.
Once the wheels are mounted, “roll” the tracks onto them. Start by wrapping the tracks around
one of the wheels and part of the way onto the other wheel. Now rotate the tracks and wheels
until the track falls into place onto the wheels. You may have to do this a couple of times to get
the right tension in the tracks.