Manual

IG52-DB4, 4WD All Terrain Heavy Duty Robot Platform
SuperDroid Robots, Inc Contact
224 Technology Park Lane (919) 557-9162
Fuquay Varina, NC 27526 SDR@SDRobots.com
www.SuperDroidRobots.com
Revised: February 8, 2019 Page 4 of 10
3. Measure, cut, and install the chain using the chain cutting instructions listed below.
4. At this point, the side slot covers can be mounted.
5. Mount the batteries with the provided hardware. Foam is included if needed for a tight fit. Simply stick it
to the underside of the battery bracket before bolting down. The foam can also be used underneath the
batteries to space them up over the weld.
6. Follow the instructions in the next section to wire the robot. Once finished with wiring the wheels and lid
can be installed.
Chain Measuring, Cutting, and installation
7. With the motor in its approximate middle position, measure out the required length of chain. You will want
full links as shown in the figure below to insert the master link through. You will be removing the outer cross-
links.