Document 2
Dormers:Roofanydormerscompletelybeforestartingthe
mainroof.
ConcealedNailMethod:EdgeStrips:Place9‐inchwide
stripsofrollroofingalongtheeavesandrakes,positioning
themtooverhangthedeck1/4inchto1/8inch.Fastenthe
stripswithrowsofnailslocated1inchand8
inchesfrom
theroofedgeandspaced4inchesatthecenteroneach
row.
FirstCourse:Applythefirstcoursewithafull‐widthstrip
ofrollroofingsothatitsloweredgeandendsareflush
withedgestripsattheeavesandrakes.Fastentheupper
edges
withnailssothatthenextcourseoverlapsthemat
least1inch.Lifttheloweredgeofthefirstcourseand
covertheedgestripswithlapcement.Pressthelower
edgesandrakeendsofthefirstcoursefirmlyintothe
cement‐coverededgesstrips.Workfromonesideof
the
sheettotheothertoavoidwinklingandblistering.End
lapsshouldbe7incheswideandcementedoverthefull
lapareawiththerecommendedcement.Nailthe
underlyingsheetinrows1inchand5inchesfromtheend
ofthesheetwiththenailsspaced4inchesinthecenter
andstaggered.
SecondandSucceedingCourses:Applythesecondcourse
sothatitoverlapsthefirstcourseatleast2inches.Fasten
theupperedgetothedeck,cementthelaps,andfinish
installingthesheetinthesamemannerasthefirstcourse.
Followthesameprocedureforeachsuccessivecourse.Do
notapplynailswithin18inchesoftherakeuntilthe
cementhasbeenappliedtotheedgestripandthe
overlyingstriphasbeenpresseddown.
MBTechnologywarrantsthatSupercapSBSmeetsour
specificationandisfreeofmanufacturingdefects.MBTechnology
isnotliableforanyproductfailureordamagecausedbyimproper
installationoranyothercauseotherthanmanufacturingdefects.
Iftheproductisdefective,MBTechnologysoleandexclusive
liabilitywillbelimitedatoption
ofMBTechnologyeithertoreplace
itorofferarefundequaltotheoriginalcostofthematerial
proratedat10%peryear.
188S.TeilmanAve,FresnoCA93706‐1334
www.mbtechnology.com
info@mbtechnology.com
1‐800‐6219281