User's Guide
Table Of Contents
Page 4
2. Getting Started
Packing list and CPE Unit
Upon receiving the product, please unpack the product package carefully. Each product is
shipped with the following items:
Table 2-1 Packing List
CPE Products
Quantity
ODU unit
1
IDU unit
1
Clamp
2
48V DC Power adapter
1
Ethernet Cable
1
If you find any of the items is missing, please contact our local distributor immediately.
CPE Unit
:
Unpacking the Equipment Table 2-1 lists all the standard parts that are supplied in your LTE CPE
Unit Installation Package. Please take the time to unpack the package and check its contents
against this list.
Installing and power on
For outdoor CPE product, it is suggested that the CPE device be installed in a shaded area to
avoid direct sun light exposure and prolong the device life.
To power on the device, the CPE must use a 48V DC power supply adapter. The power adapters
can operate in 90-250V AC range and therefore can be used in different country. An Ethernet
cable is required to connect the WAN port of IDU with the POE(LAN) port of ODU. By the way,
the ODU don’t support the hot-plugging. Once the device is powered up, the user should wait for
about 2 minutes before the device becomes operational. For CPE with the SYS LED indicator, a
solid light indicates the system has completed the startup procedure.
To connect PC, LAN switch or other type of IP device to the CPE product, the user should use
standard CAT6 Ethernet cable and connect to the appropriate LAN port. Once connected, the
CPE(IDU) LAN LED indicator should be on.
To use the phone service, operator can simply plug the phone line to the CPE RJ11 port in the
back. If the line is not registered or configured, a fast-busy tone will be provided and the
corresponding LINE LED light will be off.