Spec Sheet

SAC30APC SETUP INSTRUCTIONS 4
G
H
IMPORTANT! Always install Kick-Plates after ALL Cabinets have been
completely assembled and leveled. Refer to main cabinet instruction manual for
leveling of Peg-Legs. Always install kick-Plates from Left to Right.
Punch out the adjacent black plastic
utility cover port - through these you can
pull any necessary electrical wires, gas
lines or water lines through each
consecutive cabinets.
Place Kick-Plates on cabinet by sliding
open slots in through the provided small
pegs, then sliding to the Left. They can
be easily removed if you require access
to underside of cabinet. Always install
Kick-Plates from Left to Right, in any
cabinet package the End Kickplates are
installed last.
Always use GFCI 2 way Electrical Outlet
in front facing panel, standard electrical
can be placed on the interior. See cover
panel can be removed and hung below
when electrical is in use.
IMPORTANT! Install All Electrical Boxes, & Peg Legs before proceeding
further, follow these instructions. Electrical Wires are installed after all cabinets
are connected but before counter is installed.