assembly Instructions
InnovatIve energIesysteme
Produktion | imPort | GroSShandel | ProjektierunG | enGineerinG
SUNSET Energietechnik GmbH · Industriestr. 8 - 22 · 91325 Adelsdorf ·
Tel. ++49 / (0)9195 - 94 94 -0 · Fax ++49 / (0)9195 - 94 94 -690 · Email: info@sunset-solar.com
+-
+-
+-
Solarmodul
Laderegler
≈
AC
=
DC
-+
Wechselrichter
+-
Solarmodul
optional
+-
Solarbatterie
optional
Verbraucher
Solarbatterie
+- +- +-
4. Set up and connection
The connection order is always as follows:
1. Connect the solar battery to the charge controller
2. Connection of the solar module to the charge controller
3. Connection of consumers
At disconnection, the order is:
1. Disconnect the solar panel from the charge controller
2. Disconnect the consumer
3. Disconnect the solar battery from the charge controller
4.1 Connection of the battery to the charge controller
Note: Please note, if you use a lead acid battery, it must be lled with sulphuric acid before connection.
Attention! A battery can produce a high short-circuit current. Caution!
Always pay attention to the correct polarity.
Solar modul
optionally
Solar modul
Charge controller
Consumers
Inverter
Solar battery
optionally
Solar battery
Connection plan: