Instructions / Assembly
8 Palram Americas
• Drilling Holes in the Proles
• Adding Prole Closures
Measure, mark and pre-drill 1/4" screw holes in each End Prole Base and Inner Prole Base.
• Follow the hole spacing guidelines below for rafter or purlin installation to match your roof support structure.
• Make sure all holes are centered along the notch in the middle of each Prole channel.
Fasten a Prole Closure to the TOP and BOTTOM end of every End Prole Base
and Inner Prole Base.
• The Prole Closure will prevent the Roof Panel from sliding o when the Roof Panel is being installed.
5
6
24" max
24" max
24" max
2"
2"
2" min
Overhang
PROFILE
RAFTER
WALL
RAFTER INSTALLATION PURLIN INSTALLATION
Measure distance
between purlins
center to center
PROFILE
PURLIN
WALL
PURLIN
PURLIN
End Prole Base
Inner Prole Base
Before drilling holes, place the End Prole Base over a strip of wood.
This will protect the end of the drill bit as it penetrates the End Prole Base.
End Prole Closure
Inner Prole Closure
= HOLES/FASTENING POINTS
BEFORE INSTALLATION