INSTRUCTION MANUAL MICA HEATING BOARD SAUNA SAUNA ROOM ROOM MODEL:WS-1103 No advanced advice will be submit before we change our design and size. The pictures may be a little different from the real products. Our company keep the final explanation right.
ATTENTION 1. Users should read through this manual before assembly and use. 2. The product must install a reliable earth line and electricity leak protection. 3. Users should install power supply according to actual condition. 4. Patients with hypertension or drunk are not permitted to use this products. 5. Adult guidance is necessary for children or under age to use sauna. 6. Corrosive liquid are not allowed to bring into the room. 7. Sauna room must not over working for long time.
The assemble will takes around 2-3 hours and need 4 people to install the sauna room. 1900 4x35 4x35 1050 front view 1050 speakers 6.Seat installation. Lock the seat frame & seat back fence by screws.Put it in the seat place . The whole seat frame should be on the same horizontal line. Install 2 speakers at the back side of seat back fence (as drawing). After that, lock the whole part on the back board.
5.Put the foot plates on the bottom frame in After U disassemble the 4pcs package,U will see many pieces & U need to divide them avoid parallel way. Pls make sure all the angles are consistent and locking tightly. (in package top making mistake.
4x40 Screws 1 Firstly , U need to fix the left back board , 4.Put the top cover on the sauna room.(in right back board & back board (in package package bottom frame & top board ) There are side board ,fore& back board package ) corresponding holes for the top leds & explosion-proof light wires.Pull them out from near where U want to located the sauna the holes. After that, check whether all the room .
Screws 4x40 3 Screws 4x45 2.It is better to put sauna room near the wall . Before U move the unfinished sauna room to the wall ,pls install the electric box on the board firstly(SAUNA STOVE PACKAGE ) . U will find a hole on the board and the electric box wire will go through it & connect to the power socket. Pls connect the electric box to the power,then move the part sauna room to the right place. 5 3.After fixed 3pcs back boards, fix the front glass door in the sauna room.