Mounting Instructions

© Exotronic, 2022 - not to be used or distributed without permission Page 12 of 19
The bond area of the roof should be well drained, i.e. panels should not be bonded where water can
puddle. Any droops in the surface should be fixed first.
Other textured surfaces may not be suitable for tape and require the use of this method.
INSTALLATION ONTO ROOF RACKS (Sunman eArc panels ONLY)
If mounting on a roof rack where there is no way to support the edge of the panel, Sunman eArc
panels can be stiffened by the use of C channel to the edges, and flat bar between the front and back
of the panel, this additionally provides edge protection on the front and rear ends of the panel.
The flat bar is fixed to the panel using appropriate very high bond tape if required the bar can
protrude past the panel to line up with the roof racks to avoid the need to drill through the panel. The
C channel slots onto the panel and flat bar and it is secured using Fix8 injected into the C channel.
The panel can be fixed to the roof rack using bolts and/or screws on the exposed aluminium section.
Alternatively eyelets can be fitted at the point of sale for fixing.