Replacement Part List

Fig.6: Attach Side Rail and Post Rail (A) with Bolt (AA-1),
Flat Washer (BB) and Nut (CC).
Fig.7-1:Lift the whole assembled top roof to the
assembled post rail, then attach Comer Connector(I) to
top rail with Bolt(AA-1)Flat Washer(BB) and Nut(CC).
Fig.7-2: Fix the assembled top rail and assembled post
rail with Bolt (AA-2), Flat Washer (BB).
Fig.8: Insert into the Horizontal tube which below Post
Rail (A) from top to bottom with Nail (JJ), Fix the
assembled Davis Pavilion on the grass.