Warranty

Fig.16: Settle back card slot 1 (J1) and back card slot 2 (J2) to edge beam and middle beam,
and secure one side of back card slot to edge beam by using bolt (HH) and flat washer (BB).
Fig.16-1: Fix Back card slot 1(J1) and Back card slot 2 (J2) with Middle beam (L3).
Fig.17: Set the side card slot 1 (N1) and side card slot 2 (N2) to side PC panel, and secure them with
bolt HH and flat washer BB.
Fig.18: Insert the PC panel 1(M1) into the slot of middle beam (L3), install the edge beam 1(L1)
and edge beam 2(L2) in the same way.
Fig.18-1: Insert the PC panel (N) into the slot of middle beam (L3), install the edge beam1 (L1)
and edge beam2 (L2) the same way.
Fig.18-2: Insert PC panel 1(M1) into the bottom card slot of middle beam (L3), install edge beam 1(L1)
and edge beam 2(L2) the same way.
Fig.19: Insert the bolt (JJ) into the bottom card slot of middle beam (L3), edge beam 1 (L1) and
edge beam 2 (L2), then set the front card slot 1 (K1) to complete bolt (JJ) and insert the front
card slot into the PC panel. Install front card slot 2(K2) the same way, see step 3.
Fig.20: Install the blank 2(T2) to edge beam 2(L2) and front card slot 2(K2), and secure them with
bolt DD and flat washer BB. Same way to install the blank 1(T1) and blank 3(T3), see step 3.
CC Bolt M6X15 12 PCS
BB
Flat washer M6 24 PCS
GG Bolt M6X35 12 PCS
KK
Nail Φ8X250MM 14 PCS
LL
Screw M6*80
8 PCS
Hardware Pack 4