Replacement Part List

7 / 9
Fig.9Insert the upper end of the Middle beam (G) into the tube of Long side of the large top (H).
Fig.10Attach the lower end of the Middle beam (G) into the Middle beam connector (D) by using Bolt
(EE), Washer (BB) and Nut (DD).
Fig.11Insert the Slanting bar of the small top (J) into the Small top connector (K), then screw the
Hook(E) to the Small top connector (K),
Fig.12Lay the Big canopy (R) and then Middle canopy(Q) on the
topand do not spread them at this time ,then attach the
assembled small top to the big top connector (I) by putting
the tube of the slanting bar(J) into the tube of the big top
connector (I).
Hardware Pack 3
Description
Part#
Label
Qty
Image
Stakeφ 8*180
DD08180C
FF
16
Plastic ring
R40U
GG
112
Fig.6Assemble the Long side of the large top (H) and Large top connector (I) by using Bolt (AA)
and Washer (BB).
Fig.7Insert the upper end of the Slanting bar (F) into the tube of Large top connector (I)
Fig.8Attach the lower end of the Slanting bar (F) in to the Post (A) by using Bolt (EE), Washer
(BB) and Nut (DD).