User's Manual
Table Of Contents
- 1 About this Manual
- 2 Safety Instructions
- 3 Product Introduction
- 4 Installation Flow
- 5 Unpacking and Storage
- 6 Mechanical Installation
- 7 Electrical Connection
- 7.1 Safety Instructions
- 7.2 Port Introduction
- 7.3 Overview
- 7.4 Connecting to the Inverter
- 7.5 Connecting to the Meteo Station
- 7.6 Connecting to the Energy Meter
- 7.7 Wiring of DI Signal
- 7.8 Wiring of DO Signal
- 7.9 Wiring of AI Signal
- 7.10 Wiring of PT Signal
- 7.11 Connecting to the Remote Monitoring Device
- 7.12 Connecting to the AC Power Supply
- 7.13 Connecting to the DC Power Supply
- 7.14 Earthing Connection
- 8 Commissioning
- 9 Web Interface
- 9.1 Running Requirements
- 9.2 Login Steps
- 9.3 Web Main Interface
- 9.4 Operation Procedure
- 9.5 Overview
- 9.6 Device Monitoring
- 9.7 Device Maintenance
- 9.8 History Data
- 9.9 System
- 9.9.1 Running Information
- 9.9.2 System upgrade
- 9.9.3 Log export
- 9.9.4 Rebooting
- 9.9.5 Reset all setting
- 9.9.6 Remote Maintenance
- 9.9.7 Message Export
- 9.9.8 System Time
- 9.9.9 Forwarding Configuration
- 9.9.10 IEC104
- 9.9.11 MODBUS
- 9.9.12 Third-party portal
- 9.9.13 Forward GOOSE Service Configuration
- 9.9.14 Interface
- 9.9.15 MPLC
- 9.9.16 More
- 9.9.17 About
- 10 Grid Dispatching
- 11 Maintenance
- 12 Troubleshooting
- 13 FAQ
- 14 Appendix A: Technical Data
- 15 Appendix B: Related Drawings
- 16 Appendix C: General Information
53
The upgrade package supports both .sgu and .zip files, where the .zip file
must be compressed by UC packaging tool. Contact SUNGROW customer
service if the UC packaging tool is needed.
9.7.3 Inverter Log
step 1 Click "Device" -> "Inverter log" to enter the corresponding interface.
step 2 Select the device running information, and click the button
to view the export
progress.
step 3 Click "Save" to store the exported log in the local.
step 4 Click "Cancel" and then "Confirm" on the pop-up window, to cancel the current
operation.
-- -- EEnndd
9.7.4 AFCI Activation
step 1 Click "Device"-> "AFCI Activation" to enter corresponding interface.
step 2 Select devices need to self-checking, click “Self-checking”, and then click
“Confirm” on the pop-up dialog.
The status of devices need to self-checking must be “Enable”. If the status
is “Disable”, click
to set it to “Enable”.
step 3 Self-checking results will be displayed in the result column 7 or 8 seconds later, either
pass or failure.
step 4 Click “Clear Fault” to view relative fault clearing status on the pop-up dialog.
-- -- EEnndd
9.8 History Data
Click "History data" -> "Operation logbook" to enter the corresponding interface.
On this interface, users can view history information.
9.9 System
9.9.1 Running Information
Click "System" -> "Run-info" to enter the corresponding interface.
Information such as mobile network signal strength, AI voltage, DI status can be viewed.
9.9.2 System upgrade
Users can upgrade Logger4000 on the Web interface.
User Manual 9 Web Interface