User's Manual
Table Of Contents
- 1 About this Manual
- 2 Safety Instructions
- 3 Product Introduction
- 4 Installation Flow
- 5 Unpacking and Storage
- 6 Mechanical Installation
- 7 Electrical Connection
- 7.1 Safety Instructions
- 7.2 Port Introduction
- 7.3 Overview
- 7.4 Connecting to the Inverter
- 7.5 Connecting to the Meteo Station
- 7.6 Connecting to the Energy Meter
- 7.7 Wiring of DI Signal
- 7.8 Wiring of DO Signal
- 7.9 Wiring of AI Signal
- 7.10 Wiring of PT Signal
- 7.11 Connecting to the Remote Monitoring Device
- 7.12 Connecting to the AC Power Supply
- 7.13 Connecting to the DC Power Supply
- 7.14 Earthing Connection
- 8 Commissioning
- 9 Web Interface
- 9.1 Running Requirements
- 9.2 Login Steps
- 9.3 Web Main Interface
- 9.4 Operation Procedure
- 9.5 Overview
- 9.6 Device Monitoring
- 9.7 Device Maintenance
- 9.8 History Data
- 9.9 System
- 9.9.1 Running Information
- 9.9.2 System upgrade
- 9.9.3 Log export
- 9.9.4 Rebooting
- 9.9.5 Reset all setting
- 9.9.6 Remote Maintenance
- 9.9.7 Message Export
- 9.9.8 System Time
- 9.9.9 Forwarding Configuration
- 9.9.10 IEC104
- 9.9.11 MODBUS
- 9.9.12 Third-party portal
- 9.9.13 Forward GOOSE Service Configuration
- 9.9.14 Interface
- 9.9.15 MPLC
- 9.9.16 More
- 9.9.17 About
- 10 Grid Dispatching
- 11 Maintenance
- 12 Troubleshooting
- 13 FAQ
- 14 Appendix A: Technical Data
- 15 Appendix B: Related Drawings
- 16 Appendix C: General Information
48
step 3 Select a device in the device list and view the voltage and current information of multiple
MPPTs and multiple strings corresponding to the device on the right.
-- -- EEnndd
9.6.3 Initial Parameter
step 1 Click "Device monitoring" -> "Initial parameter" to enter the corresponding interface and
set initial parameters.
step 2 Click
to select needed device type in the drop-down list.
step 3 Select a device in the device list and set its initial parameters on the right. There are two
ways to set the initial parameters: single setting and batch setting.
-- -- EEnndd
9.6.3.1 Single setting
step 1 Select the desired country (region) and grid type.
step 2 Click "Setting" to set initial parameters for the single device.
-- -- EEnndd
9.6.3.2 Batch setting
step 1 Select the desired country (region) and grid type.
step 2 Click "Configure synchronization".
step 3 Select the desired devices in the pop-up device list, and click "Save" to achieve batch
setting.
-- -- EEnndd
9.6.4 Operation Parameters
step 1 Click “Device Monitoring” -> “Operation Parameters” to enter the interface.
step 2 Set it in accordance with the parameter setting range on the interface.
• Configure the parameters of a single device: enter the parameter value and click
“Settings”.
• Configure parameters for multiple devices: enter parameter values and click
“Configure Synchronization”, then this setting will be synchronized to multiple
devices.
-- -- EEnndd
9.6.5 System Parameters
step 1 Click “Device Monitoring” -> “System Parameters” to enter the interface.
step 2 Set the system time in combination with the parameter setting range.
9 Web Interface User Manual










