User's Manual
Table Of Contents
- 1 About this Manual
- 2 Safety Instructions
- 3 Product Introduction
- 4 Installation Flow
- 5 Unpacking and Storage
- 6 Mechanical Installation
- 7 Electrical Connection
- 7.1 Safety Instructions
- 7.2 Port Introduction
- 7.3 Overview
- 7.4 Connecting to the Inverter
- 7.5 Connecting to the Meteo Station
- 7.6 Connecting to the Energy Meter
- 7.7 Wiring of DI Signal
- 7.8 Wiring of DO Signal
- 7.9 Wiring of AI Signal
- 7.10 Wiring of PT Signal
- 7.11 Connecting to the Remote Monitoring Device
- 7.12 Connecting to the AC Power Supply
- 7.13 Connecting to the DC Power Supply
- 7.14 Earthing Connection
- 8 Commissioning
- 9 Web Interface
- 9.1 Running Requirements
- 9.2 Login Steps
- 9.3 Web Main Interface
- 9.4 Operation Procedure
- 9.5 Overview
- 9.6 Device Monitoring
- 9.7 Device Maintenance
- 9.8 History Data
- 9.9 System
- 9.9.1 Running Information
- 9.9.2 System upgrade
- 9.9.3 Log export
- 9.9.4 Rebooting
- 9.9.5 Reset all setting
- 9.9.6 Remote Maintenance
- 9.9.7 Message Export
- 9.9.8 System Time
- 9.9.9 Forwarding Configuration
- 9.9.10 IEC104
- 9.9.11 MODBUS
- 9.9.12 Third-party portal
- 9.9.13 Forward GOOSE Service Configuration
- 9.9.14 Interface
- 9.9.15 MPLC
- 9.9.16 More
- 9.9.17 About
- 10 Grid Dispatching
- 11 Maintenance
- 12 Troubleshooting
- 13 FAQ
- 14 Appendix A: Technical Data
- 15 Appendix B: Related Drawings
- 16 Appendix C: General Information
29
PPrreeppaarraattiioonn bbeeffoorree wwiirriinngg
• Disconnect the transformer from the grid.
• Disconnect the DC side of the inverter and make sure the system is in safe state.
WWiirriinngg mmeetthhoodd
Connect one end of the MPLC power cable in the scope of delivery to MPLC ports L1,
L2, and L3 of Logger, and the other end to the three-phase ports of the circuit breaker.
Port L1 of Logger must be connected to phase A of the circuit breaker, port L2 to phase
B, and port L3 to phase C. The details are shown in the following figure.
The external circuit breaker is beyond the scope of delivery, and users need to
prepare it by themselves if necessary.
The external circuit breaker just needs to meet the above two parameters (-
nominal voltage and nominal current). Other parameters, such as breaking
capacity, are not mandatory requirement.
User Manual 7 Electrical Connection