Installation Guide
7
Foundation
The site must be prepared so that the base of the shed is level all round. Checking with a spirit level is re-
quired.
This shed must be secured onto a rm and leveled foundation, preferably concrete slabs.
The foundation must have a minimum thickness of 10 cm. Allow cement to dry for at least 48 hours.
The foundation can also be constructed using bricks or blocks.
The manufacturer is not liable for the damage caused by the choice and quality of the foundation.
DOOR
Foundation
1950mm
1300mm
Back