Installation Guide
41
[W1] x 1 [S3]+[S4] x 10
ROOF PANELS 4
BACK
Some key points:
1. Place [W1]-4 so that the L-channel points to the Left wall (not your left hand) of the shed. [W1]-4 is placed under [W1]-2. [W1]-4 is placed
above [W2]-3.
2. Ten sets of [S3]+[S4] are used, four sets for nailing [W1] and six for roof panel stacking. The top two sets ①② are the most important and
should be xed rst. The eight screws holes left can be xed in whatever order.
3. The screw holes on the very edge of the ribs are not used in this step.
Right Wall
Left Wall
L-Channel
[W1]-1 [W1]-2[W2]-3 [W1]-4
[W1]