Installation Guide

41
[W1] x 1 [S3]+[S4] x 10
ROOF PANELS 4
BACK
Some key points:
1. Place [W1]-4 so that the L-channel points to the Left wall (not your left hand) of the shed. [W1]-4 is placed under [W1]-2. [W1]-4 is placed
above [W2]-3.
2. Ten sets of [S3]+[S4] are used, four sets for nailing [W1] and six for roof panel stacking. The top two sets ①② are the most important and
should be xed rst. The eight screws holes left can be xed in whatever order.
3. The screw holes on the very edge of the ribs are not used in this step.
Right Wall
Left Wall
L-Channel
[W1]-1 [W1]-2[W2]-3 [W1]-4
[W1]