Installation Guide
36
[W1] x 1 [S3] x 10 [S4] x 10
ROOF PANELS 4
BACK
[W1]
Some key points:
1. Place [W1]-4 so that the L-channel points to the Left wall (not your left hand) of the shed. [W1]-4 is placed under [W2]-2. [W1]-4 can be
placed under or above [W2]-3, because two U-channels are stacked together.
2. Ten sets of [S3]+[S4] are used, four sets for nailing [W1] and six for roof panel stacking. The top two sets are the most important and
should be xed rst. The eight screws holes left can be xed in whatever order.
3. The screw holes on the very edge of the ribs are not used in this step.
Right Wall
Left Wall
L-Channel
[W2]-1 [W2]-2[W2]-3 [W1]-4
Not Used
Not Used