Installation Guide

19
Top Frames 3
[S3] x 4
[B1] x 1
[B3] x 1
For better visibility, all other parts are hidden in this step.
This is the only correct layout of [B1][B2][B3][B4].
COMMON MISTAKE: [B1] and [B3]
The two pictures above illustrate correct and incorrect layout of [B1] and [B3].
Mistake 1: The [Opening] of [B1] should point to the inside of the shed, not the base of the shed.
Mistake 2: The [Flat Surface] with screw holes should point to the base, not the inside of the shed.
[B3] is dierent from [B1][B2][B4] because it has no opening, but two [at surfaces]. Still, the [at surface] with screw holes should point to the
base of the shed, while the other [at surface] without anything should point to the inside of the shed. Also if you pay special attention to [B3]s
[U-channel], it is obvious that it has a strange [U-channel], a slope to be precise, which points to the top of the shed.
In step [2.5], your job is to connect [B1][B3] to other frames using [S3]. LEAVE THE [Q2] [Q4]ALONE.
DOOR
[B1]
[B3]
[B2] [B4]
[B1] correct
[B1] incorrect
[B3] correct
[B3] incorrect
Right Wall
Mistake 1 Mistake 2
[Screw Hole]