Register your product for Limited Warranty! Must register product within 80 days of purchase for limited warranty Register Scan for updated Limited Warranty Warranty www.suncast.comiwarranty or call US 1 (800) 846-2345 Have Questions? We are here to help. Check out our resource library along with helpful tips, videos and FAQ's. You may call the Contact Center directly at: 1 (800) 846-2345 or write Sun cast Corporation, Contact Center, 701 N. Kirk Road, Atavist, IL 60510 {USA} www.suncast.
PIN Before You Begin... + Consult your local authorities for any permits required to construct shed. Prior to the construction of your shed, check with the local building code official to review any required permits or building limitations. « A level and sturdy foundation is required before shed construction can begin. Site preparation information is available on pages 10-11. A foundation that differs from the suggestions within this manual could prevent proper assembly and may damage pairs.
Care Instructions * Hot items, such as recently used grills, blowtorches, etc., must not be stored in the shed. + Heavy articles should not be leaned against the walls, as this may cause panel distortion and permanent damage. * Keep roof clean of snow and leaves. * The shed walls and roof sections have a textured exterior, much like vinyl home siding. Over time, dust may accumulate in the texture. When combined with moisture, this could encourage the growth of moss or mold on the shed.
Parts — Walls and Floors IMPORTANT OPEN ALL BOXES FIRST AND NEATLY LAY OUT PARTS, SMALL PARTS MAY BE CONTAINED IN EACH BOX. PLEASE REFERENCE THE PARTS LIST WITHIN THIS MANUAL TO VERIFY ALL PARTS ARE PRESENT. COMPLETE SITE PREPARATION AND FOUNDATION CONSTRUCTION BEFORE UNPACKING ALL PARTS.
Parts Doors IMPORTANT OPEN ALL BOXES FIRST AND NEATLY LAY OUT PARTS. SMALL PARTS MAY BE CONTAINED IN EACH BOX. PLEASE REFERENCE THE PARTS LIST WITHIN THIS MANUAL TO VERIFY ALL PARTS ARE PRESENT. COMPLETE SITE PREPARATION AND FOUNDATION CONSTRUCTION BEFORE UNPACKING ALL PARTS.
Parts —Roof, Headers and Windows IMPORTANT TO VERIFY ALL PARTS ARE PRESENT, UNPACKING ALL PARTS, OPEN ALL BOXES FIRST AND NEATLY LAY OUT PARTS, SMALL PARTS MAY BE CONTAINED IN EACH BOX.
Parts — Roof Steel IMPORTANT OPEN ALL BOXES FIRST AND NEATLY LAY OUT PARTS, SMALL PARTS MAY BE TO VERIFY ALL PARTS ARE PRESENT. COMPLETE SITE PREPARATION AND FOUNDATION CONSTRUCTION BEFORE UNPACKING ALL PARTS. CONTAINED IN EACH BOX. PLEASE REFERENCE THE PARTS LIST WITHIN THIS MANUAL @ 17] 0 TMRO05006 — Truss Leg 1 1MPO00023 x3 Support Bracket 1MRO01013 [] & Ridge Beam 1MR004005 Side adapter, L.
Hardware 0480375 ~ Hardware bag 0480493 ~ Hardware bag .625" Screw X315 Wall Adapter Cap NINCOMPOOP — Metal hinge plate x6 .25" Locking nut x12 0480337 ~ Hardware bag Hardware bag 0440990 Window Gaskets Screw x6 28 Locking ut Easy bolt easy driver Hardware shown at actual size (*unless otherwise noted). Extra hardware provided. Not all are used.
Parts — Door Handle Kit 0463795 ~ Door handle kit 0 0102479 Door handle x2 Hardware 0463797 ~ Door latch kit 0463812 ~ Door Latch Assembly NINCOMPOOP — Left latch plate 0480370 ~ Hardware bag #10 x 1" Fender washer x4 #10x 21/4" Pan head screw x4 Hardware shown at actual size (*unless otherwise noted). Extra hardware provided, Not all are used. .
Site Preparation and Platform Construction Materials NOT supplied with Shed Kit Note: Site preparation is required for this shed. Placing the shed on a constructed foundation is required. Without a constructed foundation, setting will probably occur, causing distortion and damage to the shed. Sun cast is not responsible for replacing parts damaged or property lost due to incorrect assembly. Warranty requires foundation.
Site Preparation and Platform Construction (continued) Materials NOT supplied with Shed Kit Wood platform critical spacing * Check all critical spacing measurements, Wood platform materials list a 1 37.25" x 84.75" 84.75" 84.75" d 4 2" 82.25" 11.75" « Please note-dimensional lumber is actually 1/2" smaller than noted sizes.
At top interior side of left door {J), attach D-ring slide bolt {0} with four screws (NN) through provided holes. Place Front Header {G} on flat surface, facing down. insert one gasket {P} into the groove around each window opening. Lay one window pane (EE) over each window opening. Secure window panes with 40 screws (NN).
Door and Header Pr-Assembly ~ /Continued Place Front Header (G) face down on flat surface. Place one header beam {Y} in each channel above and below the window openings. Secure Beams (Y) with eight screws (NN). Place short side adapter (CC) between windows with the flat bottom end facing down. Secure adapter (CC) with four screws (NN). Place Rear Header (H) face down on fiat surface. Place remaining header beam (Y) in channel on back of header. Secure Beam (Y) with four screws (NN).
Note: Use a rubber mallet to “push” left front Align tab on bottom right side of left front corner (8) with comer {B) into locked position. slot on front floor {A}. Lower panel into slot and lock in place by sliding panel toward outside of floor. T Tip left front corner (B) back to vertical position and align lower tabs on right side with slots in floor. Note: You will hear a snap when tah is fully engaged. [72] Push front floor (A) and rear floor {T) panels together and secure with six screws (NN).
Before proceeding, make sure corner is square (top view) where it meets the floor and that panel is flush (side view) with floor. If not, repeat Steps 9-10 until square and flush. ¥ Top view pre Side view 16 Align tabs on bottom of side panel {N} with slots along grant and rear floors, Lower panel into slots and lock in place by sliding panel toward front corner.
ed Assembly —~ Headers Place Front Header (G) over door opening and fit two Place Rear Header {H} over back wall and fit the four protruding support tabs into pockets in front corners. protruding tabs into pockets provided in wall. Secure Secure front header with four screws (NN). rear header with eight screws (NN} TIP: Have a second person hold wall from inside Place Left Side Header {L) over left side walls.
side adapter (BB) in position on back corner. Secure with 12 screws (NN). Note: Critical Orientation of bracket is shown and used in next steps. Repeat steps with the remaining two side adapters {BB) on left side of the shed interior. nil SIDE Attach one wall adapter (EEE) to right side wall by sliding it in place from above, Raise the wall adapter slightly to press one adapter cap (FFF) to the bottom of the wall adapter. The capped wall adapter should rest on the floor, Secure with 11 screws {NN}.
Shed Assembly ~ Roof Steel/Continued Place Ridge Beam (DD) into top of the two wall mounted side adapters. Secure with one bolt (JJ) and one nut {LL} at each end of the ridge beam. Attach three Support Brackets {Z} to the front of the Ridge Beam {DD} using two screws (NN).
Place one Truss Leg (AA) over the side adapters and support bracket on the back wall, ridge beam, and the front header. Secure into the three brackets with bolts (JJ) and Nuts {LL}. Repeat steps for the remaining two truss legs (AA). Line up one Roof Panel {Q)) with the right side header so the tabs on the header align with the five slots in the roof panel. Once the panel is engaged, slide the roof toward the back wall to fully engage the attachment features.
x5 Line up the remaining roof panel (Q} on the left side header with header tabs fitting into roof panel slots. Slide the roof panel toward the back wall to fully engage the five attachment features, Secure roof panels (Q) to the top of the front header (G) using ten screws (NN). Note: For clarity, illustration is shown with some parts removed.
Shed Assembly ~ Roof Panels/Continued Secure roof panels {Q) to the top of the back header using ten screws (NN). Note: For clarity, illustration is shown with some parts removed, Each truss leg (AA) is secured fo the roof panels {Q) with 16 screws (NN).
Shed Assembly Doors Stand right door {K} upright with three hinge mounts facing right. Slide one metal hinge plate (I}) up onto each With metal hinge plates in open position, slide one hinge over each hinge receptacle on inside of right front panel. hinge mount. Rotate hinges to outside of door. Note: For clarity, illustration is shown with roof removed. 7 Note: Use a ribber mallet if necessary. Insert two screws (CCC) into right latch plate (XX) and through right door.
Shed Assembly ~ Doors /Continued insert screws (CCC) into left latch plate (WW) and through From the outside of doors, insert door handle (VV) left door. While holding plate in place on exterior of door, stems into holes of left and right doors. On inside of secure each screw with two washers (AAA) and two doors, place washers (YY} on each door handle stem, locking nuts (BBB). -DO NOT Overattentive secure each with one screw (ZZ). -DO NOT Enlightenment upper D-ring (O} up to engage in front of header.