Product Manual
BRISBANE
11-15 Oasis Court, Clontarf, QLD 4019
Phone : 07 3284 3284 Fax : 07 3284 5969
E-mail : enquiries@aussietraveller.com.au
www.aussietraveller.com.au
MELBOURNE
235A Barry Road, Campbellfield VIC 3061
Ph: 03 9357 6565 Fx: 03 9357 6515
E-mail: info@aussietraveller.com.au
I00109A3\9
d) Again, pull down and away on the pull strap.
e) Check that the 9 o’clock position has been attained
(See Figure 9). If not repeat above process. This
then locks the roller against the ratchet.
f) Continue to pull down on the strap/bottom leg (see
all terrain position) to maintain fabric tightness and
tighten black rafter knob.
g) Move to other end of awning, pull down on pull
strap/bottom leg and lock up black rafter knob.
Note: By leaving the ratchet in the roll in position the
awning will not be able to roll out under wind pressure, but
is relying only on the black rafter knobs to stop it rolling in.
To assist the black rafter knobs and to give added strength
against wind flap and water pooling the addition of an Anti-
Flap Kit and Curved Roof Rafters is recommended.
Figure 9
3. TO REPOSITION FRAMESET LEGS FROM
PATIO POSITION BACK ONTO THE
VAN/VEHICLE
Ensure that the Anti-Flap Kit and Curved Roof Rafters have
been removed before attempting to reposition the
frameset legs.
Step 1.
Pull stakes from bottom foot. Release ropes.
Step 2.
IMPORTANT: Commencing with the rear arm (with ratchet
mechanism) loosen the knurl knob on the arm. The ratchet
should be in the roll out position.
Step 3.
Use lift handle (do not pull trigger) to swing arm back to
bottom bracket. Push support arm firmly into bottom
bracket until latch automatically secures foot on bottom
support arm (See Figure 10).
Figure 10
Step 4.
Repeat procedure on other end of awning.
4. ROLL UP PROCEDURE
Step 1.
Lower both right and left support arms to the dome nut
position using the lift handle and trigger. Repeat set up
procedure – lower one end 50% then the other fully and then
the first one fully.
Step 2.
Loosen knob on rafter. Lower rafter by depressing lever on
the outside of the frameset leg which will allow the slider to
be released. Slide rafter to bottom of support arm. Repeat
other rafter.
Outside of arm Inside of arm
Step 3.
a) Slide pull strap to the right until ratchet lever is within
reach.
b) Grasp pull strap, and by pulling out, release the pressure
on the ratchet lever. Locate ratchet lever behind roller
and rotate lever upwards and forward towards the front
of the awning (See Figure 11).
9 o’clock–right hand
end.