User Manual
9
Step 6. Preparing to Prime Machine
• Fill Water Reservoir
- Open the Lid and lift upwards using the
Handle inside.
- Fill with cold water from the tap.
- Insert the Water Reservoir into position
& close the Lid.
• Power
- Ensure that the Steam & Hot Water DIAL
is in the vertical position.
- Insert the Power Plug into a 230-240V
AC power outlet & switch the power on.
- Press the ON/OFF BUTTON to turn on
the machine.
- The ON/OFF LIGHT will illuminate &
pulse to indicate the Thermoblock is
heating up.
- The grinder is ready when the GRIND
light is illuminated from turn power on.
- When the ON/OFF, EXTRACTION
BUTTONS & DIAL LIGHTS are all fully
illuminated, the machine is in the READY
state for EXTRACTION & DIAL features.
• Insert Group Handle
- Insert the Two Cup Filter Basket in the
Group Handle.
- Align the Group Handle with the
'INSERT' position located on the left of
the Group Head.
- Insert the Group Handle flat against the
Group Head, then turn the Group Handle
right all the way to the centre position.
Step 7. Prime Espresso Machine
- Press the TWO CUP BUTTON & water
should start flowing from the
Group Head.
- Allow water to run through until it stops.
-
The machine will return to the READY state.
- Position Steam Wand over the Drip Tray.
- Turn DIAL to HOT WATER.
- Allow water to run through for 20 sec.
- Return DIAL to vertical position.
-
The machine will return to the READY state.
- Now the Espresso Machine should be
thoroughly primed.
- Wash Group Handle & Filter Basket in
warm water & dry before making your
first coffee.
- If water is not flowing from the Group
Head or Steam Wand, repeat Step 7.
- If water is still not running through,
contact Sunbeam Customer Care.
Details are on the back page.
BARISTA MAX
GRINDER
MANUAL SHOT
CLEAN
BARISTA MAX
GRINDER
MANUAL SHOT
CLEAN
PLEASE EMPTY TRAY
WIPE COFFEE GRINDS
MANUAL SHOT
GRINDER
ON / OFF
READY
BARISTA MAX
GRINDER
MANUAL SHOT
CLEAN
MAX
2.8 L
1 L
MIN
MAX
2.8 L
1 L
MIN
TOP BURR
GRINDER
COLLAR
GRINDER
INTERLOCK
HOPPER
GUIDE
2.TURN
3.HOPPER GATES OPEN
1. ALIGN
& INSERT
THERMOBLOCK
58MM CAFÉ GROUP HEAD
CENTRE
S
INSERT
INSERT
2.TURN
1. ALIGN
& INSERT
Let's Get You Started
Important: This priming step must be
completed prior to first use or if the
machine has been inactive over a long
period of time.
Note: Make sure that the Water Reservoir
is clean & free of any debris, as any fine
particles can block the water flow.
Note: When the machine has no water, it
will beep.
Note: Turning the Group Handle to the
centre position might be tight for the
first few uses.
Note: For the first few seconds the Pump
will make a louder than usual noise as it
begins pumping the water through.










