Installation Guide

In conditions where excessive condensation is a concern, painting or
staining is recommended for interior wood liner.
5 Shingle up roof to bottom of roof opening.
6 Apply a ½'‘ wide bead of caulking, set back 1" from the
roof opening around the entire opening. Set a second ½"
wide bead around the entire opening, set 1" back from
the rst bead. Sealant applied too close to the opening
may “ooze” into the opening. Can also use 3" wide x 18"
thick butyl tape, if compatible, set ½" back from opening.
6
5
8 Now shingle up sides and across top. Place shingles, as far
in as possible, but be careful not to nail through skylight
ange.
9 Bottom ange will still be exposed: we recommend leaving
it this way. If you decide to put a "false shingle"over it, be
careful not to nail through skylight ange.
IMPORTANT:
Bottom ange of skylight
MUST go on top of shingles.
7 Set skylight over opening. Nail into place through the
pre-drilled holes in the ange with 1¼" galvanized ring
shanked roong nails provided (See Fastener Schedule).
Cover the head of each nail with sealant.