Instructions / Assembly
SIZE INFORMATION Fastener Schedule
Size
Code
Roof
Opening
Finished
Opening
(Drywall
Dimension)
Fits on
Center
Spacing
Short
Side
(per)
Long
Side
(per)
1414 11½” x 11½” 10½” x 10½” 16” 3 3
1422 11½” x 19½” 10½” x 18½” 16” 3 3
1430 11½” x 27½” 10½” x 26½” 16” 3 3
1446 11½” x 43½” 10½” x 42½” 16” 3 4
1725 14½” x 22½” 13½” x 21½” 16” 3 3
1733 14½” x 30½” 13½” x 29½” 16” 3 3
1749 14½” x 46½” 13½” x 45½” 16” 3 4
2222 19½” x 19½” 18½” x 18½” 24” 3 3
2230 19½” x 27½” 18½” x 26½” 24” 3 3
2246 19½” x 43½” 18½” x 42½” 24” 3 4
2525 22½” x 22½” 21½” x 21½” 24” 3 3
2533 22½” x 30½” 21½” x 29½” 24” 3 3
2549
22½” x 46½” 21½” x 45½” 24” 3 4
3030 27½” x 27½” 26½” x 26½” 16” or 32” 3 3
3046 27½” x 43½” 26½” x 42½” 16” or 32” 3 4
3333 30½” x 30½” 29½” x 29½” 16” or 32” 3 3
3349 30½” x 46½” 29½” x 45½” 16” or 32” 3 4
4646 43½” x 43½” 42½” x 42½” 16” or 24” or 48” 4 4
4949 46½” x 46½” 45½” x 45½” 16” or 24” or 48” 4 4
5
Shingle up roof to bottom of roof opening.
6
Apply approved sealant in a 3” wide band around the entire opening. (Caulking: Apply 3 ⁄” beads
one inch apart or 3” x ⁄” butyl tape.)
7
Center skylight to cover all aluminum from inside exposure. Set skylight over opening.
The label “This Edge Down” should be at the bottom of the opening. This insures proper
functioning of the condensation wick. Fasten the skylight to the roof using #8 x 1” pan head screws (see fastener schedule). The screws
should be stainless steel, galvanized or zinc plated for resistance to corrosion. Use the pre-drilled holes for the fasteners. Place a large
bead of sealant at the joint between the ange and the roof deck. Also, seal the head of each fastener.
MODEL FGC
Minimum 2:12 pitch required.
1283.F - 3/14
Sun-Tek Manufacturing, Inc.
10303 General Drive
Orlando, FL 32824
(407) 859-2117
www.Sun-Tek.com
CustomerService@sun-tek.com
You will need:
• hammer • sealant/mastic
• keyhole saw • tape measure
• skill saw • chalkline or straight edge
• nails • trowel or caulk gun
• drill • utility knife
• 2 x 4’s
For Light Tunnel:
• 8 or 10 penny nails
• plywood or drywall
RECOMMENDED SEALANTS:
• 100% Silicone
• STS 1000 (Sun-Tek exclusive)
Butyl rubber sealant/caulk
1
To properly position skylight between trusses/rafters, locate the roof opening from the underside
of the decking. (If this area is not accessible, locate the ceiling joists from inside the house, mark
opening in ceiling (a-c), and cut ceiling opening. Then follow steps below for roof opening.)
a) measure distance between trusses/rafters and mark center point.
b) to center skylight, measure one-half of appropriate roof opening to each side of center
point and mark.
c) using the side marks as a guide, mark corners by drilling holes or driving nails through roof.
2
Remove shingles 6 - 8” out from roof opening.
3
Cut roof opening (snap a chalkline from corner to corner, or draw line with a straightedge.)
4
Frame roof opening:
a) cut two 2 x 4’s to t the actual distance between trusses/rafters and nail into place. NOTE:
Size 2525, 2549, 3333, 3349, 4949 Skip step “b” proceed to “c”.
b) cut two 2 x 4’s to the exact length of the roof opening and nail to the trusses/rafters.
c) if applicable, cut ceiling opening and build tunnel framing. (See “Light Tunnel Installation
Instructions.”)
INSTALLATION INSTRUCTIONS
INSULATED GLASS SERIES
FAILURE TO FOLLOW RECOMMENDED INSTALLATION PROCEDURES MAY VOID WARRANTY
Check local building codes for glass requirements. • Please read instructions completely before beginning. • Deck and roong felt
should already by installed.• Interior wood liner should be stained or painted before installation.
All installation information is supplied in good faith, but without recommendation to its use. No guarantee of the results of any use of this information is to be
implied, since conditions of use are beyond our control. Please consult local building codes for compliance before installing.