Installation Guide

5 Build curb (or use Sun-Teks pre-built, pre-ashed
insulated “Labor Saver” Curb)
a) Construct curb with 2x4’s, 2x6’s, etc. (depending
on height desired or building code requirements).
Curb should be minimum 3½" high. Be sure inside
measurement of curb is the same as roof opening
measurement.
b) Secure curb to roof per local building codes.
6 Shingle roof up to bottom of curb.
7 Flash curb (or use Sun-Tek’s pre-formed, pre-cut Step
Flash Kit with one-piece head and sill. Step ash for 2x4
curb only). Use galvanized sheet metal, aluminum, or
copper. Metal should extend a minimum of 4" over
shingles (on bottom side), then up sides of curb.
Flashing should be ush with curb top.
8 Shingle up sides and across the top.
9 Apply a ½" wide bead of caulking on top of the curb
around the entire perimeter. Sealant applied too close
to the opening may ooze into the opening. Can also
use 1" wide by 1/8" thick butyl tape, if compatible.
10 Set skylight over opening. Nail in place through pre-
drilled holes in side with #8 x 1¾" galvanized ring-
shank nails.
5
7
9
6