Installation Guide

13
Installation Preparation
1" = 2.5 cm ; 1' = 0.3 m
INSTALLATION PREPARATION
3
PREPARE FOR ELECTRICAL
AND VENTING
Select the vent option that your installation will
require and proceed to that section:
A
Outside top exhaust
(Vertical duct–3
1
4” x 10 Rectangular)
Use the diagram as a template and mark the
locations on the cabinet for ductwork and
electrical wiring.
Cabinet front
Cabinet Bottom
5
1
4
7
1
2
5
1
4
ø1
1
4
3
4
4”
Vertical duct access
hole
1
2
Center line
Electrical access
hole (in cabinet
bottom)
B
Outside top exhaust
(Vertical duct7” Round)
Use the diagram as a template and mark
the
locations on the cabinet for ductwork and
electrical wiring.
Cabinet front
Cabinet Bottom
7
1
2
Access
hole for 7”
round duct
8” DIA.
HOLE
ø1
1
4
3
4
4
1
4
Electrical access
hole (in cabinet
Center line
bottom)
C
Outside rear exhaust
(Horizontal duct–3
1
4x 10” Rectangular)
Use the diagram as a template and mark the
locations on the cabinet for ductwork and
electrical wiring.
Cabinet Front
4
1
4
Cabinet
Bottom
ø1
1
4
5
1
4
5
1
4
7
1
2
Electrical access
hole (in wall)
Center line