Owner manual

DOUBLE COULTER ATTCHMNT8/30/2010 8J2000.iam/
8X0072
1/2" X 3-3/4"
8J2110
8X0244
1/2" FLG TOP LOCK NUT
8X0065L
1/2" X 3" CRG BLT
8X0520
ROLL PIN
8D5312
8J1950C
8X0244
1/2" FLG TOP LOCK NUT
8J1038
7J2010H
7J2015
8X0064
CRG 1/2 X 1-1/2"
8X0244
1/2" FLG TOP LOCK NUT
8J2150
7J2050H
8J2100
8J1038N
2
Assembly Instructions:
1. Assemble blades to twin coulter hub as shown using ½” X 1 ½” carriage bolts and lock
nuts provided. Note: nothing on hub assembly needs to be taken apart, hub plates are
designed to be on inside of blade.
2. The bearings are pre-greased and sealed, there is no need for additional grease.
3. Attach Twin Coulter Assembly to shank as shown in following diagrams. Assembly can be
mounted in two congurations shown, assembly CAN NOT be mounted to rear of shank.
4. Two carriage bolts are provided to attach Twin Coulter Assembly to shank, if length pro-
vided is not sufcient, use only Grade 5 longer Carriage bolts.
5. Use Shim (PN 8J2110) provided to ll gap between side of the weldment and shank.
Secure with bolt 8X0072 and 8X0244 nut. Tighten bolt 8X0072 so side tab of weldment
begins to deform and presses shim against shank. Bolt may deform during this step. If
no shim is needed to ll gap, tighten cross bolt so side tabs of weldment touch shank. Ad-
ditional shims may be ordered if needed for narrow shanks.
Part Number Description Qty.
7J2010H STL 3/8” X 6 1/4” OD 09- 2
7J2015 STL 3/8 X OD 6-1/4” ID 3-5/16” SQ 07- 2
7J2050H RND 1-3/16” TWN CLTR SHFT-HEX 1
8D5312 NUT 1”-14TPI HEX SLOT GR2 PLN 2
8J1038 COULTER BLADE 4 BOLT 8 WAVE .197X18” 2
8J1038N OPT. - NOTCHED COULTER BLADE 4 BOLT 8 WAVE .197X18” 2
8J1950C WASHER 1.03IDX3-5/8ODX.188 CONV 2
8J2100 TWIN COULTER ATT. WELDMENT 1
8J2110 STL 11GA TWINCLTR SHIM 09- 2
8J2150 BEARING INS P206 REV OUT. RING 2
8X0064 CRG 1/2”-13NC X 1-1/2” GR5 ZDI 8
8X0065L CRG 1/2-13NC X 3” GR5 ZDI 2
8X0072 BOLT 1/2-13NC X 3-3/4” GR5 YZ 1
8X0244 NUT 1/2”-13NC FLANG TOP LOCK Z 11
8X0520 ROLL PIN 3/16 X 2” ZINC CLEAR 2
(Chamfer faces 7J2010H)