Operating Guide
14
IMPORTANT!READANDFOLLOWALLINSTALLATIONANDMAINTENANCEINSTRUCTIONS,INCLUDINGCLEANINGTHEUNITASSPECIFIED,AND
REPLACINGGASKETSANNUALLY,ANDPARTSASNEEDED.
ENGLAND’SSTOVEWORKSISNOTRESPONSIBLEFORANYDAMAGEORINJURYINCURREDDUETONEGLECT,ORDUETOUNSAFEINSTALLATIONOR
USAGEOFTHISPRODUCT.CALLTECHNICALSUPPORTWITHANYQUESTIONS.
VENTTERMINATIONCLEARANCES
A)Min.4‐ftclearancebeloworbesideanydoororwindowthatopens.
B)Min.1‐ftclearanceaboveanydoororwindowthatopens.
C)Min.2‐ftclearancefromanyadjacentbuilding.
D)Min.7‐ftclearancefromanygradewhenadjacenttopublicwalkways.
E)Min.2
‐ftclearanceaboveanygrass,plants,orothercombustiblematerials.
F)Min.3‐ftclearancefromaforcedairintakeofanyappliance.
G)Min.2‐ftclearancebeloweavesoroverhang.
H)Min.1‐ftclearancehorizontallyfromcombustiblewall.
I)Ventsinstalledwithmechanicalexhaustersshallterminatenot
lessthan12in.(305mm)abovethe
highestpointwheretheypassthroughtheroofsurface.
NotesonterminationofPelletVentPipefromNFPA211(2006ed.)Section10.4Termination:10.4.5
(Seealso“INSTALLATION”sectionofmanualANDadditionalnotesabove):
Notlessthanthree(3)feetaboveanyforcedairinletlocatedwithinten(10)feet.
Notlessthanfour(4)feetbelow,four(4)feethorizontallyfrom,orone(1)footaboveanydoor,
windoworgravityairinletintoanybuilding.
Notlessthantwo(2)feetfromanadjacentbuilding,andnotlessthanseven(7)feetabovegrade
wherelocatedadjacenttopublicwalkways.
Theexhaustexitshallbea rrangedsothatthefluegases arenotdirectedsothatitwillaffectpeople,overheat
combustiblestructures,orenterbuildings.Forceddraftsystemsandallpartsofinduceddraftsystemsunderpositive
pressureduringoperationshallbeinstalledgastightortopreventleakageofcombustion
productsintoa building.
Through‐the‐wallventsshallnotterminateoverpublicwalkways,orwherecondensateorvaporcouldcreatehazards
oranuisance.
Besuretofollowlocalcodesandallmanufacturer’sinstructions(includingexhaustpipe).
Consultaprofessional installerand/orcallTechnicalSupportifyouhaveany
questions.