Operating Guide

14
IMPORTANT!READANDFOLLOWALLINSTALLATIONANDMAINTENANCEINSTRUCTIONS,INCLUDINGCLEANINGTHEUNITASSPECIFIED,AND
REPLACINGGASKETSANNUALLY,ANDPARTSASNEEDED.
ENGLAND’SSTOVEWORKSISNOTRESPONSIBLEFORANYDAMAGEORINJURYINCURREDDUETONEGLECT,ORDUETOUNSAFEINSTALLATIONOR
USAGEOFTHISPRODUCT.CALLTECHNICALSUPPORTWITHANYQUESTIONS.
VENTTERMINATIONCLEARANCES
A)Min.4ftclearancebeloworbesideanydoororwindowthatopens.
B)Min.1ftclearanceaboveanydoororwindowthatopens.
C)Min.2ftclearancefromanyadjacentbuilding.
D)Min.7ftclearancefromanygradewhenadjacenttopublicwalkways.
E)Min.2
ftclearanceaboveanygrass,plants,orothercombustiblematerials.
F)Min.3ftclearancefromaforcedairintakeofanyappliance.
G)Min.2ftclearancebeloweavesoroverhang.
H)Min.1ftclearancehorizontallyfromcombustiblewall.
I)Ventsinstalledwithmechanicalexhaustersshallterminatenot
lessthan12in.(305mm)abovethe
highestpointwheretheypassthroughtheroofsurface.

NotesonterminationofPelletVentPipefromNFPA211(2006ed.)Section10.4Termination:10.4.5
(Seealso“INSTALLATION”sectionofmanualANDadditionalnotesabove):
Notlessthanthree(3)feetaboveanyforcedairinletlocatedwithinten(10)feet.
Notlessthanfour(4)feetbelow,four(4)feethorizontallyfrom,orone(1)footaboveanydoor,
windoworgravityairinletintoanybuilding.
Notlessthantwo(2)feetfromanadjacentbuilding,andnotlessthanseven(7)feetabovegrade
wherelocatedadjacenttopublicwalkways.
Theexhaustexitshallbea rrangedsothatthefluegases arenotdirectedsothatitwillaffectpeople,overheat
combustiblestructures,orenterbuildings.Forceddraftsystemsandallpartsofinduceddraftsystemsunderpositive
pressureduringoperationshallbeinstalledgastightortopreventleakageofcombustion
productsintoa building.
Throughthewallventsshallnotterminateoverpublicwalkways,orwherecondensateorvaporcouldcreatehazards
oranuisance.
Besuretofollowlocalcodesandallmanufacturer’sinstructions(includingexhaustpipe).
Consultaprofessional installerand/orcallTechnicalSupportifyouhaveany
questions.