Pre-Delivery/Install Checklist

10
Should you encounter any problems, contact Customer Service at (888) 919-0070 from 8AM to 5PM MST, Monday-Friday.
Extended operating days and hours during peak season requirements.
6. With the Drain Valve of the Sand Tank pointing outwards,
place the Sand Tank onto the Sand Tank Base .
2
2 1
2
1
ALIGN
Drain Valve
5. Insert and push the Lock Pins all the way down to
secure the Pump to the Sand Tank Base .
1
16
17
16
17
1
PUSH
7. Put the Center Pipe 5 into the Sand Tank 2 . Position the
Center Pipe 5 at the bottom center of the Sand Tank 2 .
8. Place the Sand Guard 6 over the top opening of the Center
Pipe 5 .
5
2
6
5