Installation Guide

3. Inspect hot and cool water tube, please clean it at first if necessary
4. Connect the one side of ()Mixer water connection pipe with handle body’s mixer
connector , and then Connect your house hot water tube and cool water tube with
handle body’s hot water connector and cool water connector separately
5. Mount the handle body which connected with hot and cool water hoses and one side
of mixer water connection pipe into wall with cement until the cement is dry and solid