Dimensions Guide
Step 2:
Screw the Shank ”C” with the spout “A” on the desk ,screw nut ”D” and
please put the rubber gasket “B” into as diagram.
Step 3:
Screw nut ”I” and put Rubber gasket “H” on hot valve body “J”, fixing
the Escutcheon “F” with Foam gasket “G” and knob “E” on the desk
Screw the knob “E” to the valve body (“J”) by the screwdriver and then
screwing the cover clockwise.
Install another cold valve body with the same way.
Step 4:
Screw the T-pipe “M” to the thread tube “C”