Installation Guide
5. INSTALLATION
5.1 Turn on your shut-off valve for cleaning the hot and cold water supply pipe before connect to the faucet, allow the water flush
3~5 minutes to flush out dirt and debris. Shut off the water supply again after finish.
5.2 Screw in the shanks “D” onto the faucet body base’s screw hole, then position the faucet with shank ”D” and O-ring “B” on the
mounting surface
5.3 Screw in hoses “h” onto the faucet body base’s water inlet hole as below and attach the O-Ring “B” to the “O-ring” groove
SUMERAIN SANITARY GROUP WWW.SUMERAIN.COM