Manual

Read the manual carefully before use. Better understanding
means better and safer sowing. For English follow the symbol.
GB
CONTENTS
English
Pages
START-UP
13
13
12-13
14-15
16-17
• A Preparing the machine
• B End-of-field manoeuvres
• C Handling
• D Grain-free tilling
• E Fitting the triangular hitch
to the harrow
Pages
SETTINGS
24-33
34-37
38-39
40-41
42-43
• A Setting the flow
• B Bout markers
• C Drive wheel
• D Depth control
• E Adjusting the covering
harrow
Pages
MAINTENANCE
57
56-57
57
58-59
60-61
62-63
• A Maintenance
• B Lubrication
• C Checks
• D Distribution
• E Technical specifications
• F Sticker positions
18-19
20-21
21
22-23
• F Fitting the hitch to the
Packer roller
GHydraulics connection
• H Electrics/Electronics
connection
• I Filling the seed box
Pages
SETTING CHARTS
72
73-101
• A Pre-setting reminder
• B Seeding rate charts
44-53
54-55
54-55
• F Tramlining
• G Disengaging half of the
seed drill
• H Emptying the seed box
Pages
ACCESSORIES
64-65
64-65
66-67
68-69
70-79
• A Depth limiter
• B Uniband share
• C MS flow rate modulation
• D Areameter
• E Depth modulation
10