Manual

• A Preparing the machine
• B Handling and moving
• C Tractor control
• D Hitching to the tractor
• E Folding
28 model
• F Hitching to the seed drill
1010
• E Replacing the tines
• F Sticker positions
• G Details
• A Side markers
• B Hydraulic rear linkage
• C Mechanical rear linkage
• D Stone guard
• E Cage-mounted roller
• F Cultipacker
Read the manual carefully before use. Understanding your equipment
means better use. For English follow the symbol.
CONTENTS
English
Pages
LINKAGE
12
12-13
16-17
20-21
20-21
22-25
Pages
TRANSMISSION
26-29
30-31
32-33
34-35
• A Universal joint shaft
• B Fan shaft
• C Selecting the rotary speed
• D Adjusting the rotary speed
Pages
START-UP
36-37
38-39
40-41
42-43
44-45
• A Adjusting the side deflector plates
• B Adjusting the working depth
• C Adjusting the packer roller
• D Adjusting the levelling bars
• E Erasing tracks
Pages
MAINTENANCE
Pages
OPTIONAL EQUIPMENT
46-49
50-51
51
52-53
54-55
54-55
57
57
56-57
56-57
• A Safety
• B Checks
• C Lubrication
• D Maintenance
58-61
62-63
64-65
GB