Use and Care Manual

The roof panel part #K1/K2/K3 is laid in order; Part #Z shall be inserted at the fixed position of top beam and top roof to
prevent rainwater intrusion as shown in ; the roof panel K1/K3 is fixed with G1/G2 & D1/D2 by using screws 2#,
gaskets and nuts as shown in , then fix with screw 1# and gaskets to side frame beam.
Steel Gasket
Plastic Gasket
12