Design Guide

subzero.com | 47
Standard Handles
Optional stainless steel pro handles are avail able through
an authorized Sub-Zero dealer. For local dealer information,
visit the nd a showroom section of our website,
subzero.com.
Refer to the chart below for standard handle lengths for
PRO models.
HANDLE LENGTH
36" MODEL 48" MODEL
Door 27
11
/16" (703) 27
11
/16" (703)
Refrigerator Drawer 26
3
/16" (665) 19
15
/16" (506)
Freezer Drawer 26
3
/16" (665) 11
9
/16" (294)
Plumbing Requirements
Installation must comply with all applicable plumbing codes.
Locate the water supply line within the shaded area shown
in the illustration below. Connect the water supply line to the
house supply with an easily accessible shut-off valve. Do
not use self-piercing valves. The water supply line must not
interfere with the installation of the anti-tip bracket.
A reverse osmosis system can be used provided there is
constant water pressure of 35–120 psi
(2.4–8.3 bar) supplied
to the unit at all times. In this application, the water ltration
system must be bypassed by removing the lter. A copper
line is not recommended for this application.
PLUMBING REQUIREMENTS
Water Supply
1
/4" OD copper, braided
stainless steel, or PEX tubing
Pressure 35–120 psi
(2.4–8.3 bar)
Excess Line for Connection 36" (914)
3" (76)
6"
(152)
5
3
/16"
(132)
RIGHT SIDE
OF OPENING
AREA EXTENDS
1
/2" (13)
FORWARD ON FLOOR
Water supply location
PRO REFRIGERATION