Installation Instructions

802781, 802782, 802783, 812340, 812341, 812342, 814020, 815837, 820395
Warming Drawer Handle Installation Instructions
812548 / Rev D / October, 2011
INST
ALLATION PROCEDURE:
1” Tubular Handles
(Kits 802781, 802782, 802783):
1. Mark custom panel to locate the drill holes using
the center-line dimensions from Figure 1. Drill
four (4) 7/32'' to 1/4'' holes.
2. Counter bore 5/8'' holes to 5/32'' deep so that you
can completely recess the head of the bolt and
washer (See Figure 2).
3. Insert appropriate length bolts (two 1/4'' bolts, but
may vary depending on panel thickness) with
washer(s) through holes into handle (See Figure
2).
4. Tighten the bolts to secure the handle to cabinet
panel.
5. Proceed with panel attachment instructions includ-
ed with the WWD flush mount panel kit.
3/4” Tubular Handle Framed & Unframed
(Kits 814020, 815837, 820395):
1. Mark custom panel to locate the drill holes using
the center-line dimensions from Figures 3 or 4.
Drill four (4) 7/32'' to 1/4'' holes.
(CONTINUED ON NEXT PAGE)
Page 2 of 4
C
L
19.310
23.750
C
L
15.310
Figure 1. 1'' Handle Dimensions
1-3/8” to 1 3/4”
Figure 2. Decorative Panel Prep for Handle
C
L
26.625
29.375
C
L
25.375
Figure 4. 3/4'' Unframed Handle Dimensions
C
L
24.124
C
L
25.374
26.875
Figure 3. 3/4'' Framed Handle Dimensions
Counter Bore
Bolt
Decorative Panel
(Cross Section View)
Washer